■ Utilization of the associated gas unit, capacity 350 million m3/ year, Verkh-Tarskoe field JSC "TNK-BP";
■ Petrol production unit, capacity 50,000 tons/year, Republic of Tajikistan, Kanibadam;
■ Pumping/ heating stations, condensate deethaniziser plants, gas booster stations, oil treatment units for Samburgskoye, Urengoiskoye and Yaro-Yakhinskoye Oil and Gas Condensate Fields;
■ Gas treatment plant at Kirinskoye Gas Condensate Field;
■ Gas and gas condensate treatment plant for Kazanskoye Oil and Gas Condensate Field;
■ Associated gas utilization unit for Verkh-Tarskoye field (TNK-BP);
■ Gas and gas condensate treatment plant for East-Urengoyskoye license block;
■ Methanol regeneration unit for South-Tambeyskoye Gas Condensate Field;
■ Preparation of design documents for process equipment for: "Facilities of Salmanovskoye (Utrenneye) Oil and Gas Condensate Field" and others;
■ Unit for gas conditioning for transportation (gas conditioning unit-2) at Krasnodarskaya CS;
■ Development of equipment design of the gas treatment and adsorption dewatering unit, Pipeline from Dzuarikau to Tskhinval;
■ Development of design documentation for process equipment and PCS, field supervision of the equipment fabrication for adsorption dewatering unit Pipeline NB pipe1420 Malai-Bagtyyarlyk (Turkmenistan);
■ Engineering designs of the equipment, "Condensate stabilization unit (process trains 8-9) Surgutsky condensate stabilization plant";
■ Development of the engineering design for Process scheme of the fossils extraction and transportation complex Zhdanov field, Stationary platform, "Zhdanov-A";
■ Gas condensate stabilisation unit at Samburgskoe Oil and Gas Condensate Field;
■ Associated gas utilization unit, capacity 100 KTPA, Dolinnoe and Aksaz fields (Republic of Kazakhstan, Aktau);
■ Associated gas utilization unit, Akshabulak field (Republic of Kazakhstan);
■ Complex gas treatment unit, capacity 9 BCMPA, Nakhodkinskoe gas field, LLC "Lukoil-Western Siberia";
■ Design and delivery of process equipment for: "Facilities at Ach51 reservoir of Urengoyskoye field (Samburgskoe block)";
■ Design and delivery of process equipment for: "Facilities for Achimovsky deposits of Urengoyskoye field (Samburgskoe block). Gas treatment plant. Condensate deethaniziser plant. Train-3";
■ Preparation of design documents for process equipment heat treatment of natural gas at: "LNG terminal in Vysotsk port. Line with annual capacity of 1.14 mln. t LNG";
■ Turn-key delivery including delivery of a process unit for process trains 1, 2 of GTU-41, for construction of 4А and 5А sites for Achimovsky deposits of Urengoyskoye Oil and Gas Condensate Field.
■ Turn-key delivery including delivery of a complete process unit for process train 5 of GTU-31 for Achimovsky deposits of Urengoyskoye Oil and Gas Condensate Field.